What needs to be done to get her on the road:
Wheels:
- New Brake Pads (front & rear) - will be installed in March 2009
- New Rotors (Front & Rear) - to be installed March 2009
- 4 Tires - March 2009 - Nitto NEO-GEN's
- New Lug Nuts - Black
Engine Area:
- Complete the custom intake - done
- Flush cooling lines - done
- Flush radiator - done
- Drain tranny fluid/ drop pan/replace filter/ new fluid** - even better: swapping to probe gt manual tranny
- Remove current heads - done
- Install newer heads w/ gaskets - done
- New valve seals/ valve cover gaskets - done
- Cam seals - done
- Replace Timing Belt - done
- New Water Pump/ gasket - done
- Replace Alternator (millennia?)**
- Degrease/Paint fuel rails (bronze high temp) - done
- Install KLZE rails and injectors - Blue tops going on the DE
- New Spark Plugs/ Wires - done
- Drain/refill Brake fluid- done
- Drain/refill Power Steering Fluid - leaks.... so yeah, drained at least
- Replace Radiator Hoses
- Replace Coolant Reservoir - replaced then reinstalled/relocated
- Install Carbon Fiber Hood - done
- Install tranny oil cooler - NOPE - not with manual tranny
- Re-route tranny oil lines to cooler - no longer necessary
- Clean up engine bay - done (an on-going process)
- Remove A/C system - done
Future Plans:
- 17” rims (Konig?) and tires (gloss black or gunmetal)
- Wings West Supra style spoiler
- EVO front bumper - NO EVO BUMPER!!!!!! Staying stock
![Smile :)](./images/smilies/icon_smile.gif)
- Sound deaden the entire bottom of cabin
- 2X 12” Subs w/ amp in custom fiberglass enclosure - not fiberglass but done
- Polk Audio Components w/ crossovers - done
- Install StreetGlow Neons (Neo-Blue Lava tubes, lightning, and plain neons) - done
- ATX to MTX swap (90% of parts obtained)
- SS Brake lines
- SS Clutch Lines - done
- 7” flip out monitor
- Combat Side Skirts - NOPE maybe MS replicas
- Repaint with Pearlescent Black - mmmmmmmmm, pearl paint
![Smile :)](./images/smilies/icon_smile.gif)
- Racing Seats (Black) - maybe Corbeau's or Bride
- Complete Silver/black interior project (paint panels, rear seat, etc.) - in progress
- Of course…KL-ZE SWAP!!!!!!!!!! - Decided to go turbo'd DE instead (wooooooshhhhhh)
- Aluminum Radiator
- Millennia IM - using the short, straight neck
- New headers/high flow cat/cat-back exhaust - goin custom with exhaust outlet angle-cut out the side of the
car, in front of the passenger side tire.
- New Tach - NOPE, not until it becomes strictly track
- Projector Headlamps
- New Fog Lights
- Custom Badges
- Custom Fiberglass Center Console - wait until you see this when it's done
![Smile :)](./images/smilies/icon_smile.gif)
- Custom Switch panel - complete, but replaced with guages instead
- More as I think of them…
The heads/gaskets/water pump/ timing belt are complete!!!!!