Well I guess I should update this.. its been a while now LOL So here is a list of stuff that has been accomplished since last I posted.
Replaced & bled the slave cylinder (good to have a functioning clutch)
Bought replacement rear seat panels from a local junk yard.
Finished the auto to manual seat belt conversion.
Removed the dash, inspected the entire wiring harness.. tested every freaking Relay I could find. Reinstalled the dash.
Removed the gauge cluster and checked and replaced all blown lights.
Finished wiring in the lights for the Autometer Gauges
Finished wiring in the reverse lights. (Figured out which wires with my BETM)
Installed all rear paneling and replaced all the Push Clips that hold the panels in place.
Installed my Lighted shifter knob.
Recovered my ceiling liner and sunroof insert panel. (Pics of this below)
Installed a battery cut off switch so I can disconnect the battery on the fly without having to remove the rear seats or interior panel to get to the battery.
Modified the drivers seat so that it sits back 3 inches further than stock (ahhhh leg room!)
Here is a pic of what my GS looks like without a dashboard.. kinda sad.. anyone like spaghetti?
Things left to do before she reaches drivability
Need to adjust the sunroof panel so it opens and closes normally.
Need to reinstall the ceiling liner, and upper trim & panels.
Wire in the clutch safety interlock switch at the clutch pedal
Reinstall center column box
Reinstall front & rear seats
Check tire pressure
Anyway.. you guys get the gist.. I havent kept up on this log as well as I probably should have.. but she is almost back on the road.
Tunes67